BIN LIFTING SYSTEMS: MANUAL BAR LIFTS

MOC 800
MOC 800

Manual Low level waste collection system

 

MOC 500
MOC 500

Manual Low level waste collection system

 

UPC 800

Manual Low level waste collection system

 

UPC 500

Manual Low level waste collection system

 

MOC 800

The MOC 800 compact reliable binlift that can safely handle a 2 and 4 wheel containers containers with its robust rear mounted lift system. Note: This product is specifically engineered for use out of Europe. It encompasses many design elements suited to overseas operations, it is therfore not wholly complaint to EN1501 norm, which is required inside Europe.

 

  • Compact design with minimum overhang to reduce risk of rear axle overloading
  • Simple lever or push button operation
  • Narrow and Wide versions to perfectly match all Olympus models
  • Low weight design to to help optimise and achieve higher payloads
  • Integrated mounting with Olympus
  • Can be upgraded to handle skips with the addition of the industrial skip arm option
MOC 800 Bin Lift System
Europa MOC 800 Bin Lift System
Europa MOC 800 Bin Lift System
SPECIFICATIONS

  • Cycle Time: 2 and 4-wheel containers 13 sec. Skips 30 sec.
  • Handling Capacity: 800kg
  • Noise Level: < 65dB(A)
  • Mounting Method: Integrated on Olympus tailgate
  • Operation Mode: Manual
  • Weight: 500kg
  • Hydraulic Requirements: 20 l/min., 190 bar
  • Auto-Gather: No
  • Diagnostic Display: No

MOC 500

The MOC 500 compact reliable binlift that can safely handle a 2 and 4 wheel containers containers with its robust rear mounted lift system. Note: This product is specifically engineered for use out of Europe. It encompasses many design elements suited to overseas operations, it is therfore not wholly complaint to EN1501 norm, which is required inside Europe.

 

  • Compact design with minimum overhang to reduce risk of rear axle overloading
  • Simple lever or push button operation
  • Narrow and Wide versions to perfectly match all Olympus models
  • Low weight design to to help optimise and achieve higher payloads
  • Integrated mounting with Olympus
  • Can be upgraded to handle skips with the addition of the industrial skip arm option
Europa MOC 500
SPECIFICATIONS

  • Cycle Time: 2 and 4-wheel containers 13 sec. Skips 30 sec.
  • Handling Capacity: 500kg
  • Noise Level: < 65dB(A)
  • Mounting Method: Integrated on Olympus tailgate
  • Operation Mode: Manual
  • Weight: 500kg
  • Hydraulic Requirements: 20 l/min., 190 bar
  • Auto-Gather: No
  • Diagnostic Display: No

UPC 800

The UPC is a trade binlift offering a robust build and safe operation which has proved itself in markets worldwide. It can handle 2 and 4-wheel bins. Its unique design has a low number of moving parts and gives a short overhang when compared to other designs.

 

  • Compact design with minimum overhang to reduce risk of rear axle overloading
  • Low cost of ownership delivered by a simple but robust design with less moving parts
  • Narrow and Wide versions to perfectly match all Olympus models
  • Low weight design to to help optimise and achieve higher payloads
  • Designed for mounting with Olympus
  • Can be used with a crane chute option
UPC 800 Bin Lift System
UPC 800
UPC 800
SPECIFICATIONS

  • Cycle Time: 2-wheel containers 11 - 12 sec. 4-wheeled 13 - 14 sec
  • Handling Capacity: 800kg
  • Noise Level: < 65dB(A)
  • Mounting Method: Frame mounted on Olympus tailgate
  • Operation Mode: Manual
  • Weight: 725kg
  • Hydraulic Requirements: 46 l/min., 160 bar
  • Auto-Gather: Option
  • Diagnostic Display: No

UPC 500

The UPC 500 is a trade binlift offering a robust build and safe operation which has proved itself in markets worldwide. It can handle 2 and 4-wheel bins. Its unique design has a low number of moving parts and gives a short overhang when compared to other designs.

 

  • Compact design with minimum overhang to reduce risk of rear axle overloading
  • Low cost of ownership delivered by a simple but robust design with less moving parts
  • Narrow and Wide versions to perfectly match all Olympus models
  • Low weight design to to help optimise and achieve higher payloads
  • Designed for mounting with Olympus
  • Can be used with a crane chute option
UPC 500 Bin Lift System
UPC500 Bin Lift System
UPC800 Bin Lifting System
SPECIFICATIONS

  • Cycle Time: 2-wheel containers 11 - 12 sec. 4-wheeled 13 - 14 sec
  • Handling Capacity: 500kg
  • Noise Level: < 65dB(A)
  • Mounting Method: Frame mounted on Olympus tailgate
  • Operation Mode: Manual
  • Weight: 675kg
  • Hydraulic Requirements: 46 l/min., 160 bar
  • Auto-Gather: Option
  • Diagnostic Display: No

NEWS

Why Prime Movers Make Cargo Work Faster...
Why Prime Movers Make Cargo Work Faster

Discover how tractor trailers move heavy loads easily using strong pulling power, smart design, and stable handling in ports and logistics yards.

Contship & Terberg: Efficiency and Sustainable......
Contship & Terberg: Efficiency and Sustainable Terminal Operations

At the heart of the La Spezia terminal’s day-to-day efficiency lies a robust and modern equipment fleet, which currently includes 46 terminal tractors and 48 trailers.

How Tractor Trailers Move Big Loads Easily...
How Tractor Trailers Move Big Loads Easily

Discover how tractor trailers move heavy loads easily using strong pulling power, smart design, and stable handling in ports and logistics yards.

Showcasing the service and support of our Welsh......
Showcasing the service and support of our Welsh experts for St. David’s Day

Whatever our Welsh customers need, we’re ready to deliver. That’s what drives the focus of our Merthyr Tydfil Service Centre. Serving private customers and local authorities across Wales, we do...

          

 

 

PROVIDING THE GLOBAL WASTE AND RECYCLING INDUSTRY WITH ROBUST, RELIABLE, EFFICIENT AND INNOVATIVE ECO-TECHNOLOGY